PL_0122

Modificado el Lun, 23 Mar a 11:52 A. M.

Title 

Cannot move.

Severity 

Information message.

Data 

1: Reference information of the selected operation (WO ID and phase code). 

2: When relevant, additional information.

Explanation 

The application cannot perform this action. The reason is in message 2:

  • Operation in progress: Operations in progress must remain in first position on the machines. You cannot move them to a different position.

  • Before an operation in progress: Operations in progress must remain in first position on the machines. You cannot insert another operation before them.

  • In the middle of a fixed link: The requested move would break a fixed link.

  • In a group of synchronized operations: The requested move would alter a synchronization group.

  • In a campaign series: The requested move would break the campaign, by distributing the production of two operations in the campaign onto different machines.

  • Grouping change not allowed for production phases if the source and target groupings do not have the same readjustment: The purpose of this constraint is to guarantee SRP plan consistency.

  • On the Stand-by grouping: You cannot move blocks of operations to Stand-by.

  • On the T_H_M (time out of machine) grouping: You cannot move the selected operation to the T_H_M grouping, as this grouping is reserved.

Action 

Verify the operation or block of operations to move, and the target machine for the move.

¿Le ha sido útil este artículo?

¡Qué bien!

Gracias por sus comentarios

¡Sentimos mucho no haber sido de ayuda!

Gracias por sus comentarios

¡Háganos saber cómo podemos mejorar este artículo!

Seleccione al menos una de las razones
Se requiere la verificación del CAPTCHA.

Sus comentarios se han enviado

Agradecemos su esfuerzo e intentaremos corregir el artículo