PL_0123

Modificado el Lun, 23 Mar a 11:54 A. M.

Title 

Cannot move the operation. Remove the fixed link. OR Cannot move the operation. Try freezing the WO.

Severity 

Information message.

Data 

1: Reference information of the selected operation (WO ID and phase code). 

2: Reference information on the operation where the fixed link starts. 

3: Reference information on the operation where the fixed link ends.

Explanation 

You cannot move the selected operation, because that would break a fixed link:

  • The selected operation has a fixed link with another operation OR

  • You are trying to move the selected operation between two operations that have by a fixed link.

Action 

To move the operation, you can:

  • If possible, use the MOVE BLOCK option to move both operations at the same time, so they keep their link. OR

  • Remove the fixed link so you can move each operation separately. If applicable, you can then recreate the fixed link between them. If the fixed link is inside the WO, another possibility is to freeze that WO. As a result, all its operations move to the Stand-by grouping but keep the fixed links they have with one another. Still, you can use that feature only if there are no fixed links with other WOs.

¿Le ha sido útil este artículo?

¡Qué bien!

Gracias por sus comentarios

¡Sentimos mucho no haber sido de ayuda!

Gracias por sus comentarios

¡Háganos saber cómo podemos mejorar este artículo!

Seleccione al menos una de las razones
Se requiere la verificación del CAPTCHA.

Sus comentarios se han enviado

Agradecemos su esfuerzo e intentaremos corregir el artículo