Title
Constraints on maximum lead times could be lost.
Severity
Information message, logged for the environment. Table: JOURNAL.
Data
Reference information of the selected operation.
Explanation
The application has moved the operation as requested. Yet, this operation belongs to a synchronization group, and there is a risk that it no longer meets its synchronization constraint.
Action
Verify the operation you moved. Verify if it still meets the maximum lead time constraint. If required, move the operation again to restore the initial situation.