Title
Cannot add link from a sequenced operation to a planned operation.
Severity
Information message.
Data
1: Reference information of the source (sequenced) operation.
2: Reference information of the target (planned) operation.
Explanation
You are trying to add a link between two operations with incompatible statuses. The status of the operation where the link starts is "Sequenced", whereas the status of the target operation is "Scheduled". This is an unrealistic production situation, and the application does not allow it in the plan.
Action
Verify the selected operations.
If possible, add the link only after you have scheduled the plan.