PL_0260

Modificado el Mar, 31 Mar a 9:12 A. M.

Title 

1/ Labor allocation failed on operation 

2/ Operation with labor requirements > skill maximum number (see AFF_OPER.ERR) 

3/ Some machines have labor requirements/skill > maximum labor

Severity 

Information message, logged for the environment. Table: JOURNAL.

Data 

1: WO ID and operation ID. WO index and operation index (for internal use only). 

2 and 3: No additional data.

Explanation 

Labor allocation failed, most likely because labor requirements are inconsistent with the capacity of the skills.

Action 

Make sure that the labor requirements at operation and machine level are compatible with the skill capacity. 

If available, verify the AFF_OPER.ERR file. 

erify load and capacity data from the Labor chart. You may also verify whether the operator calendars are consistent with the machine calendars, and whether capacity changes conform to the maximum number of operators at skill level.

¿Le ha sido útil este artículo?

¡Qué bien!

Gracias por sus comentarios

¡Sentimos mucho no haber sido de ayuda!

Gracias por sus comentarios

¡Háganos saber cómo podemos mejorar este artículo!

Seleccione al menos una de las razones
Se requiere la verificación del CAPTCHA.

Sus comentarios se han enviado

Agradecemos su esfuerzo e intentaremos corregir el artículo