Title
Cannot time-stamp, circuit in the graph.
Severity
Corrupted data. The application is about to close.
Data
Name of the operation description file.
Explanation
Before moving a group of constrained operations, the application verifies scheduling feasibility for each operation concerned. The verification indicates that it is impossible to build the operations graph and get a feasible plan.
The file lists the operations involved.
Action
Verify the synchronization model. Make sure that overlap links and maximum start-end lead times are valid.